Add: Dongheng International Mansion,
No. 108 Tianyuan Road,
Jiangning, Nanjing,
China. 211100
Tel: +86-25-52072766
E-mail: business@js-jnhb.com |
|
|
| Ningbo Jiufeng Thermal Power Plant |
| The flue gas desulfurization project of 3×130T/h high temperature high pressured circulating fluidized bed boilers, signed the contract on 17th Apr 2009, three boilers in one tower with the construction of the vertical discharge on top of the tower... |
|
|
| The reconstruction and extension flue gas desulfurization project of 2×135MW boilers, sighed the contract on May 2008 with the construction of two boilers in one tower, handling 1.15million Nm3/h flue gas, 2% designed sulfur content in fired coal... |
|
|
| Chongqing Longqiao Thermal Power Plant |
| 2×130T/h boilers flue gas desulphurization project, signed the contract on May 2008 with the construction of two boilers in one tower, 5.05% designed sulfur content in fired coal... |
|
|
| 2×150MW boilers flue gas desulfurization project, signed the contract on Oct 2007 with the construction of one boiler one tower, 2% designed sulfur content in fired coal, handling 0.96 million Nm3/h volume of flue gas... |
|
|
| The flue gas desulfurization project of two circulation fluidized beds with full time and high sulfur content coal, singed the contract on July 2006 with handling about 0.122 Nm3/h volume of flue gas, 5% designed sulfur content in fired coal... |
|
|